The Deformable modularized COVID-19 Epidemic Prevention Hospital
Description
The hospital has a building area of 750 ㎡ and 24 beds, takes isolation negative pressure ward as the core module (4 beds) which compresses various architectural components into a module based on the prototype of a 20-foot international standard container, and combines with other auxiliary modules. Based on the module generality design, temporary epidemic prevention hospitals of different sizes with long service time can be constructed through the rapid combination of modules.
Special Mention
Excellent Architecture
Conceptional Architecture
Client
Wuxi Environmental Sanitation Services CO.,LTD.
Architecture/Concept
Hanchenping studio,CUMT